Xuzhou Longer New Materials Co., Ltd.

Xuzhou Longer New Materials Co., Ltd.

The construction site is working slowly and the project schedule can't be met? Longer's integrated panel can directly help you save 40% of the construction time!

2026 02/28

 
Construction workers are all troubled: there are too many traditional construction procedures - setting up formwork, removing it, doing insulation, layer by layer. It's labor-intensive and time-consuming, and the progress can't be accelerated. The cost is also high. The client keeps urging, and the more urgent, the more likely problems will arise.
To address these troubles, Longer has specially launched an integrated panel system. It uses the Non-dismantling Formwork Insulation Integrated Panel (Non-dismantling Template Insulation Integrated Panel). It combines the formwork, insulation, and structural layer together. The factory prepares it in advance, and then it is directly installed and poured on-site. There is no need to remove the formwork or do insulation separately. It can be completed in one step.
It can really achieve this: the on-site construction time is directly reduced by 40%, fewer people are needed, the work is done faster, and the project delivery is earlier.
This product is mainly used for Commercial building insulated wall systems. It can be used in shopping malls, office buildings, factories, and public construction projects. It has good insulation effect, a solid wall structure, and is less likely to crack or fall off. There is basically no need to worry about maintenance in the later stage.
Those in need can directly Request a quote for insulated formwork. We will provide you with a solution and calculate the price.
Product features
Integrated formwork and insulation, no need to remove the formwork, several procedures can be done less
Prepared in the factory, directly installed on-site, the construction is simple, and the quality is more stable
The insulation and structure have the same lifespan, done in one step, and long-term worry-free
Tips
Before entering the site, align according to the drawings, directly install, and the efficiency is higher with less cutting and modification
For commercial projects and exterior wall projects that need to be completed quickly, it is the most cost-effective choice
Communicate the plan in advance, and you can start working on-site without delaying the progress
Longer does not engage in empty talk. It is helping you: work faster, save labor, have a more stable schedule, and lower costs, making site management easier.
 
Non-dismantling formwork insulation integrated panelNon-dismantling formwork insulation integrated panelNon-dismantling formwork insulation integrated panelNon-dismantling formwork insulation integrated panel